Help with completing the form
Solar panels and injection during a transfer
Indicate solar panels or another production installation and copy the visible consumption and injection readings.
Consumption and injection
Copy only the values that your meter actually displays. If in doubt, contact your network operator or energy supplier.
- Consumption: electricity you take from the grid, expressed in kWh.
- Injection: electricity your production installation feeds into the grid, expressed in kWh.
Follow up the production installation separately
The energy transfer document records the transfer information and meter readings. Separate steps with the network operator may still be required to transfer or change the production installation itself.